INDEX: J.I.O.A. Final Report No.1

Fragen und Antworten zu Archiven, Literatur und anderen Quellen
Antworten
Wilm

INDEX: J.I.O.A. Final Report No.1

Beitrag von Wilm » 22.05.2004 21:12

J.I.O.A. FINAL REPORT No.1

German underground installations
Part one of three

Unique design and construction methods

„Unique design and construction methods”

Index

GENERAL
- Arrangement and Presentation
- Summary of Part One
- Recommendations

SECTION I MESSERSCHMITT FACTORIES NEAR MUNICH, GERMANY
Scope
- Par. 1 – Description of Target
- Par. 2 – Purpose of Report
- Par.3 – Names of Investigators

INTERESTED AGENCIES
- Par. 4 – Agencies

PERSONNEL INTERROGATED
- Par. 5. Participating Firms and Persons

DESCRIPTION OF “WEINGUT II” FACTORY
- Par. 6 – General Description of Factory
- Par. 7 – Influence of Geology on Factory Location
- Par. 8 – Preliminary Construction
- Par. 9 – Excavation of Arch Abutments
- Par. 10 – Aggregate Screening Plant
- Par. 11 – Concrete Mixing Plant
- Par. 12 – Placement and Compaction of Arch Fill
- Par. 13 – Pouring of Concrete in Abutments
- Par 14. - Pouring of Concrete in Arch
- Par 15. - Construction Joints
- Par 16. - Removal of Fill underneath Arch
- Par 17. - Removal of Blanket Coat from Inside Arch
- Par 18. –Settlement of Structure
- Par 19. – Pressure under Abutments
- Par 20. – Interior Building Construction
- Par. 21 – Plant for Making Precast Members at UTTING
- Par. 22 – Heating and Ventilating
- Par. 23 – Water Supply, Sewerage and Drainage
- Par. 24. – Camouflage
- Par 25. – Air Raid Precautions
- Par 26. – Materials, Costs and Construction Personnel
- Par 27.- Construction Schedules – Estimated vs Acutal

DESCRIPTION OF “WEINGUT I” FACTORY

- Par. 28 – General Description of Factory
- Par. 29 – Placement and Compaction of Arch
- Par. 30 – Pouring of Concrete in Abutments
- Par. 31 – Pouring of Concrete in Arch
- Par. 32 – Removal of Fill Underneath Arch
- Par. 33 – Heating and Ventilating
- Par. 34 – Construction Schedule

CONCLUSIONS

RECOMMENDATIONS

APPENDIX A – Photographs of “WEINGUT II” Factory
“ B - Photographs of “DIANA II” Factory
“ C – Photographs of Precast Plant at UTTING
“ D – Figures
“ E – List of WEINGUT Drawing Filed with OCE

SECTION II – UNDERGROUND FACTORIES AT EBENSEE, AUSTRIA

SCOPE
- Par. 1 – General Description of Target
- Par. 2 – Purpose of Report
- Par. 3 – Names of Investigators

INTERESTED AGENCIES
- Par. 4 – Agencies

PERSONNEL PARTICIPATING
- Par. 5 – Participating Firms and Persons

CONSTRUCTION OF “ANLAGE B”
- Par. 6 – General Description of plant
- Par. 7 – Geologic Considerations
- Par. 8 – Tunnel Excavation Methods
- Par. 9 – Precast Concrete Lining of Tunnels
- Par. 10 – Waterproofing Precast Lining of Tunnels
- Par. 11 – Precast Plant for Manufacturing Tunnel Lining.
- Par. 12 – In-Place of Tunnels
- Par. 13 – Heating and Ventilating
- Par. 14 – Gas Proofing and Bomb Protection
- Par. 15 – Water supply and Sewerage
- Par. 16 – Camouflage
- Par. 17 – Construction Equipment and Personnel
- Par. 18 – Construction Schedules

CONSTRUCTION OF “ANLAGE A”
- Par. 19 – General Description of Plant
- Par. 20 – Geologic Considerations
- Par. 21 – Construction Procedures
- Par. 22 – Ventilation Systems
- Par. 23 – Protective Wire-Mesh Lining
- Par. 24 – Boiler Room Stack
- Par. 25 – Method of Handling Underground Flows
- Par. 26 – Miscellaneous

CONCLUSIONS

RECOMMENDATIONS

APPENDIX A – Photographs of EBENSEE Factories
“ B – Figures
“ C – List of EBENSEE Drawings Filed with OCE

SECTION III – OTHER FACTORIES OF SPECIAL INTEREST

Misburgh Oil Refinery at MINDEN, Germany
Messerschmitt Plant at ST. GEORGEN. Austria
Herman Goering Werke at LANGENSTEIN, Germany
Project „Dogger“ at HAPPURG, Germany
Eugen Grill Werke at HALLEIN, Austria
M_A_N Machinen Fabrik at MAINZ-WIESENAU, Germany

APPENDIX A – Figures
„ B – List of ST. GEORGEN Drawings
“ C – List of MAINZ-WEISENAU Drawings